Issue 37
I. Mazur et alii, Frattura ed Integrità Strutturale, 37 (2016) 287-296; DOI: 10.3221/IGF-ESIS.37.38 292 module of processing of periodical defects (Fig. 3); module of certification of hot-rolled rolls (Fig. 4); module of monitoring for the critical defects at the preparation to the cold rolling on the mills 2030 and 1400 (Fig. 5); module of visualization and analysis of rise of defects of surface (Fig. 6). Figure 3: Visualization of application for the certification of hot rolled rolls Figure 4: Visualization of application of processing of periodical defects
Made with FlippingBook
RkJQdWJsaXNoZXIy MjM0NDE=